Countdown Ferrymead
Countdown Ferrymead
153 Tonnes
The new Countdown Ferrymead in Christchurch was completed in late 2013. HML Engineering did all the structural steel fabrication and installation for this project ran without a hitch.
Countdown Ferrymead
The new Countdown Ferrymead in Christchurch was completed in late 2013. HML Engineering did all the structural steel fabrication and installation for this project ran without a hitch.