Nelson Forest Kaituna Saw Deck

30 Tonnes

HML Engineering undertook the new saw deck project in 2010. This job presented a few challenges, with the fabrication being required at our site in Blenheim and then transporting the 10mtr wide load to site for installation.

This saw deck was retrofitted into the existing sawmill and presented further challenges due to the tight confines of the site. Despite these challenges HML Engineering delivered on time and within budget.

Image gallery

Considering a project?

No project is too big for the HML Engineering team.
Talk to us early. We will help you get the quality you want, when you need it.