Yealand’s Marc Building

59 Tonne

HML Engineering was responsible for the structural steel fabrication and installation for the new Yealand’s Marc Building completed in 2019. With over 50 tonne of steel HML was able to quickly fabricate and install the structural steel for the building.

Image gallery

Considering a project?

No project is too big for the HML Engineering team.
Talk to us early. We will help you get the quality you want, when you need it.