HML Engineering

Yealands Marc Building

A bit about this project:

HML Engineering was responsible for the structural steel fabrication and installation for the new Yealands Marc Building completed in 2019. With over 50 tonnes of steel HML was able to quickly fabricate and install the structural steel for the building.

Project Gallery