HML Engineering

Water Of Leith Bridge

A bit about this project:

HML Engineering were responsible for the fabrication of the structural steel used on the Water of Leith Bridge. Measuring in at 21.5M tall and 5.8M wide the end tower was a remarkable statement of our workmanship.

Project Gallery