SH1 Wairau Cycle Bridge

HML Engineering worked closely with Fulton Hogan to fabricate and install the new clip on cycle bridge for the SH1 Wairau Bridge. This is an early feature in the new Whale Trail from Picton to Kaikoura. With install from March through to May 2022, the HML team were able to install the bridge off the […]
Water Of Leith Bridge

HML Engineering were responsible for the fabrication of the structural steel used on the Water of Leith Bridge. Measuring in at 21.5m tall and 5.8m wide, the end tower was a remarkable statement of our workmanship.
Indevin

HML Engineering was tasked with creating a catwalk stair tower, pipe bridge and canopy at Indevin winery in Blenheim. HML fabricated and installed the structural steel required, which helped Indevin to improve the efficiency of their operations
NZ Wines Pipe Bridge

Precision manufacture and an impressive install. Millimetre perfect, quite a feat given the camber.
Waimea River Cycle Bridge

Cycle bridge as part of the spectacular Great Taste Trail
iReX Staging Piling Gate

Supplied to HEB Downer JV as part of the iReX project at Picton Ferry Terminal.
Waitohi Outlet and Viewing Platform

Specialist project at the Waitohi Stream outlet in Picton. Functional and architectural.
Lake Elterwater Cycle Overpass

A cycle bridge over rail on The Whale Trail project between Picton and Kaikōura near Te Ruakanakana / Lake Elterwater.