HML Engineering

Countdown Redwoodtown

A bit about this project:

HML Engineering has recently completed the structural steel fabrication and installation of the new Countdown in Redwoodtown Blenheim. The 3500 square metre building has replaced the existing Redwoodtown Countdown.

Project Gallery