A bit about this project:

HML Engineering undertook the new saw deck project in 2010. The job presented several challenges, including the requirement to fabricate at our Blenheim site and transport the 10m wide load to site for installation.

The saw deck was retrofitted into the existing sawmill and presented further challenges due to the tight confines of the site. Despite these challenges HML Engineering delivered on time and within budget.