HML Engineering

No. 1 The Terrace Wellington

A bit about this project:

In excess of 90 tonnes of seismic strengthening steel went into this distinctive Wellington CBD building.  Site measures, drilling, bespoke structural steel, night work, noise mediation, site welding and restricted access were the challenges met on this project in efforts to bring this 18 storey building up to code.

Project Gallery