Andrew Clayton Hops Processing Facility

HML recently completed the structural steel fabrication and install of three custom designed sheds at Andrew Clayton Hops. This project was installed on several different dates to ensure smooth erection. We had a team of four riggers onsite to get the building put up to the schedule and at record pace, safely.
Marlborough Waste Facility

The Blenheim Waste Transfer Station has been upgraded to a Waste Sorting Centre (WSC).
Golden Bay Fruit Coldstore

HML was proud to be involved in building the new 3,300 square metre facilities in Motueka for internationally successful grower cooperative Golden Bay Fruit.
Nelson Forest Kaituna Saw Deck

HML Engineering undertook the new saw deck project in 2010. The job presented several challenges, including the requirement to fabricate at our Blenheim site and transport the 10m wide load to site for installation. The saw deck was retrofitted into the existing sawmill and presented further challenges due to the tight confines of the site. […]
Resene Warehouse

HML Engineering fabricated and installed the structural steel at the new Resene Warehouse in Upper Hutt .
Babich Winery

HML Engineering were responsible for the structural steel fabrication and installation for the Babich winery. This project was originally 100 tonne and had a canopy added during the project. HML Engineering adapted quickly to the extra steel required for fabrication and install and delivered the project on time.
Total Windows Taranaki

HML Engineering is pleased to have worked on this new manufacturing facility for Total Windows in Taranaki.
Indevin

HML Engineering was tasked with creating a catwalk stair tower, pipe bridge and canopy at Indevin winery in Blenheim. HML fabricated and installed the structural steel required, which helped Indevin to improve the efficiency of their operations
Hortus Stage 3 Kitchen

HML Engineering was tasked with fabricating structural steel and installing it for Hortus. This project shows the ability and diversity that HML can cater too. We are proud to be supporting clients who invest in the welfare of the Vineyard team.
WineWorks Marlborough Warehouse

HML Engineering is proud to say we fabricated, erected, and installed the total structural steel for WineWorks’ new warehouse. Spanning 14,500m2 across two sections in Marlborough’s Wine Business Park, the warehouse provides WineWorks with a fully enclosed bottling and labelling hall. WineWorks is a warehouse company that specialises in bottling, labelling, storage, and distribution, allowing […]