HML Engineering

Porse House

IMG 20140704 00561

Seismic upgrade to this multistorey central Blenheim building to bring it above building code standards for earthquake strength.

Charles Fergusson Tower Seismic Upgrade

Seismic structural steel Wellington

HML Engineering completed the seismic upgrade of the Charles Fergusson Tower.  With seismic strengthening and upgrades occurring simultaneously across all 18 levels, the project pushed our drafting, fabrication, and installations teams to their limits, achieving quality results for our client. We maintained our scheduled programme through constant collaboration with the client and engineer, allowing us to […]

Harbour City Centre

20190304 083301 Scaled 1 768x1024

Significant seismic remediation on a large scale building in a challenging Wellington CBD location.

No. 1 The Terrace Wellington

20181128 145428 Scaled 1 768x1024

In excess of 90 tonnes of seismic strengthening steel went into this distinctive Wellington CBD building.  Site measures, drilling, bespoke structural steel, night work, noise mediation, site welding and restricted access were the challenges met on this project in efforts to bring this 18 storey building up to code.

Xero Building

Xero Scaled 1 1024x576

In 2016 HML undertook the supply and installation of multi storey structural steel to international accounting and software company Xero’s international head office building.  The tight and busy CBD location made for some challenges, but the results are fantastic.